Weekly Production log 9

My group and I have finally finished editing our music video and we have finished it for the deadline like everyone else so we are hopefully going to get a good grade on it. Now all we have to start doing in the lesson is our evaluation which shouldn't be hard it will just be long.I think that me and my group did find it hard to edit because some times we did have to ask for help from our teacher.
When my teacher looked back at the work before we imported it he said that our work is distinction quality but there was some gaps and apart from that there wasn't anything wrong with our music video.Then I said that we worked to the best of our ability and what grade we get we will be happy with it because we worked hard on it and we just tried our best but if we do get a distinction im sure we will be a bit surprised.When we finished it we then had to import it which the teachers done for us so that was okay.Then I think the music videos would have been marked by the time we finish it we should get the results back Hopefully we do get the grades we want but if we don't sure we would still be okay with what ev er we get

Wednesday, 18 March 2015

weekly production log 8

Me and my group are carrying on with the editing its all going well because we all have our jobs so we know what we are doing to get it done quick we did have to reclaim some clips because we were missing some important clips that we did need so we went to ilford and the skate park and reflimed the. We just carried on i think what we struggled with was the lip syncing because a lot of the time our lip syncing was just randomly become out of sync and it got really annoying so we asked our teacher to help us and he showed us how to fix the problem if it happens in the future. But so far we are on track we are almost finished we are now up to 4 minutes of the song which is like 30 secs from being finished so we are close.to finishing our music video for the deadline on Wensday I find rashaan helpful because he has taught me how to cut to the snare drum so I now know how to cut to it so I can do it if he's not In the lesson.

Friday, 6 March 2015

Weekly Production Log 7

Me and my group now have edited up to 1 minute to 2 minutes so we are about half way there we still have a week left because the deadline is for next Friday so we need to pick it up and stay on track so we don't fall behind and meet the deadline so we can pass because if we fall behind now all the work we have done will just be a waste so we have to now focus because we now know that the roles for editing are me as the editor and Rashaan does cutting to the beat and Leo tells me what shots to cut and edit so we all have our jobs and we all stick to them because we are all quick with the roles that we have chosen because I am the fastest editor its best for me just to do it so we don't fall behind and don't take to long.We also have re-filmed  some shots in Ilford and in seven kings park because we needed to re-film and get some extra clips to fill in some gaps that needed to be filled we also got the some more gym clips as well that we needed to extend the gym shots we had before weren't enough so we had to get some more But i think if we stick to the pace we are at now we will get it done before the deadline and we will hopefully make a good music video but as always if we do get stuck we can always ask our teachers for help.

Monday, 2 March 2015

Weekly production Log 6

Me and my group are now at the stage of editing our footage we all have experience with editing footage and we can all help out. I think that we wont struggle with this editing but if we do we can always ask for help.We have now imported all our footage onto our mac and we have started editing the editing will take us more then 3 weeks for us to do so we have a deadline and we will all stick to it so we stay on track. Our following plans are going to involve us working together and just getting the editing done on time which shouldn't be a problem because all of us know how to edit but as I said before if we need help at any point we can always ask our teachers.
So far there hasn't been any problems with the work because all we had to do was just import the footage and just edit it and our music video has to be longer then the actual song.
we are focusing on getting each shot to cut to the beat which is going well we do swap the editor around so that we can all get a chance to edit so on Thursday I have the control of the mouse while rashaan done the cutting to the beat and Leo read from the script. Next week we all going to start staying back so that we can finish it on time because we only have 2 and half weeks on editing the whole music video.